Projects

Completion works for the crossing of the Medjerda river on the RN7 at PK 65+500 in the governorate of JENDOUBA

Our mission is the development of execution design relating to the completion works of the crossing of the Medjerda river on the RN7 at PK 65 + 500 in the governorate of JENDOUBA.

Consistency of studies:

  • Road works including drainage of the RN7 on either side of the bridge (2x2ways);
  • Detailed design of two large VIPP type hydraulic structures of 110m lengths each. The deck is made up of prestressed beams with a span of 37m. The structures are built on posts.
  • Verification of existing supports and foundations vis-à-vis the beam launching forces

Services performed

Execution design

Country

Tunisia

Client

AFRIQUE TRAVAUX

Date

Project cost

10.687.171 TND