Control, follow-up and technical assistance mission for the 2x2 lanes of the RVE533
The work to be carried out is as follows:
- Clearing of right-of-way;
- General earthworks;
- Treatment of areas with compressible soil;
- Construction of pavement layers;
- Construction of hydraulic structures (scuppers of various sizes);
- Development of crossroads.
- Construction of the Medjerda river crossing structure (GOH11): reinforced concrete girder bridge with six 20 m spans with a geometric bias of 80 grades. The bridge is made up of two juxtaposed decks separated by a central void.
The mission entrusted to Ceta consists of:
- Checking all the documents in the call for tender
- Carrying out continuous monitoring of the project execution by making a full time resinding engineer to assist with the work available to the administration.
- Checking and approve all execution documents submitted by the Company;
- Contributing to the resolution of all technical problems and difficulties that may arise during the execution of the work;
- Writing a monthly and quarterly report on the physical and financial progress of the project.
Services performed
Control, monitoring and technical assistance mission
Country
Client
Ministry of Equipment, Housing and Regional Planning
Directorate General of Bridges and Roads – DGPC
Project cost
57 304 410,662 IN DINARS
FundingRepublic of Tunisia and BEI