Development works of the South intermunicipal association
The execution design for the development of the road link between the South exit and the West exit of the city of Tunis include:
- The development of an urban expressway in 2x2 separate lanes,
- The construction of three (03) Reinforced Concrete slab bridges of four 61 m long and two (02) open gantries for the difference in level of the main crossroads and the metro track,
- The creation of one (01) interchange at the South Intercommunal / South exit intersection,
- The creation of a (01) pedestrian bridge,
- The construction of retaining walls.
Services performed
Execution design