Development of the X4 radial between the Malagua crossroads and the X20 road
Taking into account the urban development in the new Menzah I and II garden districts in the governorate of Tunis, the Tunis regional directorate of the Ministry of Equipment, Housing and Regional Planning has decided to a direct link between line X4 and road X20.
The projected radial originates on track X20, about 1km from the X3 junction and 1.5km from the X20 / X2 junction. The project concerns the extension of the X4 radial (from the Carrefour Malagua to the planned interchange at the intersection with the X20 over a length of 2231m): The project also includes the upgrading to 2x2 lanes of the section between the roundabout in front of the Sheraton hotel and the headquarters of the National Television and the roundabout X4 Avenue ChedlyZouiten. The length of this section is 555m.
Our services:
- Collection and analysis of existing data: - Data collection and field reconnaissance;
- Preliminary and detailed design: - The study of the different variants of routes.
- Economic, environmental and social assessment and preliminary design studies: - Geometric studies of variants of layouts; - Traffic and economic profitability studies / Metering and O / D survey; - Hydrological and hydraulic studies, as well as the longitudinal drainage of the platform; - The inventory of dealer networks and the study of deviations and protections;- The study of work; - The environmental impact study;- The preparation of preliminary measurements and the estimate of the work.
- CAD design;
- Preparation of tender documents: -Preparation of the call for tender for the execution of work needed
Services performed
Preliminary design Studies: APS, APD and DAO
Ministry of Equipment, Housing and Regional Planning
Directorate General of Bridges and Roads – DGPC
Funding
European Investment Bank (EIB)