Extension works on the North Highway in the Ivory Coast
The mission concerned the execution design of the construction works of six (06) Works of Art of the Extension of the North Highway in the Ivory Coast - Lot 1 SINGRIBO-PACOBO under Lot 2 Section PACOBO -TAABO.
Consistency of the work:
- Verification of the call for tender
- Study of the motorway platform (roadway and outbuilding)
- Verification and review of hydraulic and hydrological studies
- The geotechnical study of the sites of the structures and verification of the foundation method
- Construction of a diffuser made up of an underpass, four ramps and two roundabouts
- 03 underpass in closed frame (4.50 x 4.00)
- 03 overpasses in solid slab (PSIDA) of 4 spans
Services performed
Execution design