Projects

Rehabilitation of 48.1km of roads located in the governorates of Sousse & Zaghouan

The project includes:

  • Economic assessment: Profitability analysis carried out by application of the HDM III model;
  • Traffic assessment;
  • Preliminary design;
  • The widening of the pavements to 7.60m for sections outside the municipal perimeters and 12.00 with the installation of 2x2 lanes 6m wide under TPC;
  • Pavement structures' Reinforcement studies;
  • Diagnosis of the existing drainage system (drainage structures, hydraulic structures), their sizing, the width of the platforms, and the study of the necessary arrangements;
  • Localized rectifications of the layout and longitudinal profile drawings with consideration of economic conditions' limitations;
  • Preparation of the tender dossier for the work

Services performed

Feasibility studies, Preliminary design, Detailed design, and call for tenders dossier

Country

Tunisia

Client

Ministry of Equipment, Housing and Regional Planning
Directorate General of Bridges and Roads – DGPC

Date