Projects

Reinforcement of the RN12 road from PK53 + 000 to PK91 + 900 in the Governorate of Kairouan - Lot 2 (L = 42.1km)

The project includes the reinforcement of the existing roadway and the construction of its outbuildings, the development of the urban areas of Haffouz and Kairouan, the construction of (3) hydraulic structures, the drainage of the road platform by ditches in earth and concreted and buried collectors, the development of (02) flat crossroads, vertical signage and ground markings.

Services performed

Control, monitoring and technical assistance mission

Country

Tunisia

Client

Ministry of Equipment, Housing and Regional Planning
Directorate General of Bridges and Roads – DGPC

Date

Project cost

20 109 000 TND INCLUDING TAX