Rural Routes
For the opening up of rural populations 156 km of agricultural routes in the governorates of Kef, Siliana, Jendouba and Zaghouan need to be developed.
The project includes:
- The construction of a new two-way roadway with widening of the existing platform,
- The construction of hydraulic structures and transverse drainage structures, ditches and earthen \ concrete channels for the drainage of the platform,
- The development of crossroads, signage works.
Services performed
Preliminary design Studies: APS, APD and DAO
Country
Client
Direction Générale des Ponts et Chaussées - Ministry of Equipment, Housing and Land Use Planning
Date