Study of the ring road in the city of Kasserine
Determination of road layouts for the development of an urban expressway in 2x2 separate lanes over a length of 10km.
In addition to the route of the track, the CETA office is studying the construction of a large 24× (4×3) multiple box culvert hydraulic structure on Darb river, the creation of hydraulic structures (single and multiple box culverts), and the development of roundabouts.
Services performed
Preliminary design Studies: APS, APD and DAO
Country
Client
Ministry of Equipment, Housing and Regional Planning
Regional Directorate of Kasserine