Study of three structures in the Governorates of Béja, Jendouba and Kasserine
The mission concerns the study of the following three structures:
- OA on Titrya river at pk 144.2 of the RN 7 in the governorate of Béjà
- OA on Thibar river at pk 29.6 of the MC75 in the governorate of Jendouba
- OA on Darb river at pk 11.0 of MC182 in Kasserine governorate
The study was carried out in two phases:
1st phase: summary preliminary design study, feasibility and impact on the environment.
2nd phase: development of execution design and preparation of tender documents.
The study foresees:
OA sur Titrya river: The proposed work is a box culvert of dimensions 2 (4mx4m). The connecting road develops a linear length of approximately 320ml.
OA on Thibar river: The proposed work is a straight bridge with a total length of 33m. It is a girder bridge with two 16.5m spans. The connecting road develops a linear length of approximately 760ml.
OA sur Darb river: The proposed work is a reinforced concrete girder bridge with four spans of 18m.It consists of two juxtaposed aprons. The total length of the structure is 72m.
The connecting road develops a linear length of approximately 340ml.
Services performed
Preliminary design Studies: APS, APD and DAO
Ministry of Equipment, Housing and Regional Planning
Directorate General of Bridges and Roads – DGPC
Project cost
460 000 + 800 000 + 2 300 000 = 3560 000 TND
FundingB.A.D