Study of two overpasses on the Grombalia deviation
The mission concerns the study of the two overpasses on the bypass of Grombalia in the Governorate of Nabeul with a linear length of 7 km (2x2 lanes) which starts from the R N1 / RR27 junction to the RN1 / RR41 junction.
The study foresees:
- The construction of two open gantry railway leveling structures with a span of 13.60m, including the wing walls;
- The construction of two structures for crossing the Medjerda-Cap Bon Canal using reinforced concrete girder bridges with a single span equal to 23m on a deep foundation and at a bias equal to 75 grades;
- The construction of several hydraulic structures such as single, double and multiple scuppers.
- The development of 4 crossroads;
- Horizontal and vertical signage work;
- The installation work of equipment and safety devices and the protection of structures (guardrails, gabions and riprap);
- And street lighting for the road.
Services performed
Preliminary design Studies: APS, APD and DAO
Country
Client
Ministry of Equipment, Housing and Regional Planning
Regional Directorate of Nabeul
Project cost
15 000 000 TND
FundingB.E.I