Supervision of the TESSA river crossing's construction work on the MC60 road at PK75 + 500 in the KEF governorate
The mission is to elaborate the execution design related to the construction works of the TESSA river crossing engineering structure on the MC60 road at PK75 + 500 in the KEF governorate.
The studies relate to:
- The development of the crossing road of 1149m length
- General groundworks
- Drainage works: one culvert (1x1) and two culverts (3x3)
- The construction works of a girder bridge which is 64.4m long, 10.5m wide, 10.5m wide on shallow foundations aiming the cross of the river.
Services performed
Execution design