Our mission is the development of execution design relating to the installation works of the irrigation pipe as part of the project of the transfer of the El Kabir and Moula dams.

The study concerns:

  • Establishment of the plan and the longitudinal profile of the pipe.
  • The sizing of the stop blocks and tie rod systems at the elbows of the Phi 1400 pipe at a pressure of 10 bars.
  • Establishment of formwork and reinforcement plans for stops and tie rods.
  • The study of the structure (calculation notes, formwork and reinforcement) of the drain structure (low point) and of the drain structure (high point).