Work of art on Joumine river
The objective of the mission is to rehabilitate the structure on the Joumine river in order to secure traffic and trade in the region and consolidate economic activity.
The mission concerns the study of an engineering structure for crossing the Joumine river at PK59 + 900 of the RN7 road, in the town of Mateur and the study of a bridge to support the networks of concessionaires and ensure supplying the city of mateur with drinking water.
Services performed
Preliminary design Studies: APS, APD and DAO
Country
Client
Ministry of Equipment, Housing and Regional Planning
Bizerte Regional Directorate
Project cost
520 000 €