Projects

Work of art on Joumine river

The objective of the mission is to rehabilitate the structure on the Joumine river in order to secure traffic and trade in the region and consolidate economic activity.

The mission concerns the study of an engineering structure for crossing the Joumine river at PK59 + 900 of the RN7 road, in the town of Mateur and the study of a bridge to support the networks of concessionaires and ensure supplying the city of mateur with drinking water.

Services performed

Preliminary design Studies: APS, APD and DAO

Country

Tunisia

Client

Ministry of Equipment, Housing and Regional Planning
Bizerte Regional Directorate  

Date

Project cost

520 000 €