Works of realization of a pedestrian bridge crossing the Yasmine Hammamet Marina canal and associated facilities
It is a pedestrian bridge crossing the Yasmine Hammamet marina canal. The gangway will consist of a metal deck 83m in total length, equipped with a movable span allowing the passage of sailboats. It will rest on reinforced concrete supports submerged in water. The ancillary facilities consist of a car park with around 90 spaces, new access to the docks on the beach side and a seawater reception and filtering structure.
Consistency of studies:
- Study of the site and of the owner's program in order to prepare the terms of reference for the design, manufacture and assembly of the metal deck and in particular the mobile span intended to allow the passage of the sailboats in order to entrust them to an international company specializing in this type of work.
- Assist the Company in analyzing the offers and choosing the most technically and economically advantageous solution for the MDO.
- On the basis of the descent of loads relating to the steel deck solution retained, we proceeded to the design, calculation and drawings of the reinforced concrete supports of the gangway, including the establishment of the price schedule and the quantitative estimate.
- The design of the public lighting of the bridge
Studies of ancillary facilities:
The studies of the ancillary developments concern:
- The design of the new access road to the quays and the parking lot on the beach side, including the public lighting component.
- Study of the access road to the platforms and the parking lot.
- Study of the reinforced concrete structure for receiving and filtering seawater.
- Study of the public lighting of the car park and the access road to the platforms.
- Establishment of written documents for the "Parking, extracting seawater and walkway" market
Services performed
Execution design