Works to upgrade the RN3 to 2x2 lanes between Djbel El Oust and El Fahs in the Governorate of Zaghouan-Lot n °3: El Fahs deviation from PK0 + 220 to P6 + 507
This project is part of the establishment of a highly developed road network to enable the economic and social development of inland regions and endow them with a major asset to attract investors.
This project is the study of a new axis to bypass the town of El Fahs with a total length of 3.20 km, which originates at the RN3 road and ends at the intersection RN4 and RL631.
The main objectives of the detour: The decongestion of road traffic, as well as the improvement of safety, the improvement of the urban aspect and the increase in speed.
Our services:
- Collection and analysis of existing data:
- Data collection and field reconnaissance;
- Preliminary and detailed design:
- The study of the different variants of routes.
- Economic, environmental and social assessment and preliminary design studies:
- Geometric studies of variants of layouts;
- Traffic and economic profitability studies / Metering and O / D survey;
- Hydrological and hydraulic studies, as well as the longitudinal drainage of the platform;
- The inventory of dealer networks and the study of deviations and protections;
- The study of work;
- The environmental impact study;
- The preparation of preliminary measurements and the estimate of the work.
- CAD design;
- Preparation of tender documents:
- Preparation of the call for tender for the execution of work needed
Services performed
Preliminary design Studies: APS, APD and DAO
Ministry of Equipment, Land Use Planning and Sustainable Development
Zaghouan Regional Directorate
Project cost
11 200 000,000 TND INCLUDING TAX
FundingEuropean Investment Bank (EIB)