Works to create 2x2 lanes of the RN16 road between Gabes and the town of El Hamma from PK4 + 400 to PK7 + 000 and from PK8 + 300 to PK 27 + 000, L = 21.3 KM
The project begins 3.8 kilometers after the exit of Gabès and stops at the entrance to the town of El Hamma. It also includes the reinforcement of the 13.1 km el Hamma bypass. The planned road will be developed into 2x2 lanes with a TPC and BAU on both sides in the open countryside and sidewalks in urban areas. The length is 21.3 km.
The mission concerns the Control, Monitoring and Technical Assistance of the work of:
- Earthworks and pavement;
- Drainage;
- Hydraulic and drainage works;
- Development of 11 roundabouts;
- Signage and safety equipment;
- Lighting;
Services performed
Control, monitoring and technical assistance mission
Country
Client
Ministry of Equipment, Housing and Regional Planning
Directorate General of Bridges and Roads – DGPC
Project cost
44 686 235 TND INCLUDING TAX
FundingBAD AGTF